
ABLE Site - Moveable ECOR at Whitewater, KS

The moveable ECOR system was deployed at Smileyberg, KS from May 9, 2001 to Oct. 29, 2001.
It was next deployed at Brainerd, KS from March 30, 2002 to Dec. 8, 2003.
It is currently deployed at Whitewater, KS starting Jan. 20, 2004.
It is deployed as a moveable/solar powered system. Flux data are retrieved
three times a day via digital cellular link.
Photos of the Moveable EC System
EC System setup at Brainerd, KS
EC Solar panels at Brainerd, KS
EC System setup at Whitewater, KS
EC Control Box at Whitewater, KS with Arcom embedded Linux system
The following data are available:
Moveable EC Plots
Moveable EC Computer Status

Return to ABLE Site Diagram
Return to ABLE Main Page
